Short answer: Gatwick’s current noise insulation scheme offers eligible homes up to £4,300 plus VAT towards double glazing for windows and doors. A new, larger scheme for the Northern Runway opens shortly after construction starts on the airfield, and homes that used the current scheme can apply again.
Where the Northern Runway stands
The Secretary of State for Transport granted development consent for the Northern Runway on 21 September 2025, and on 23 June 2026 the High Court upheld that decision. Gatwick says the project doesn’t need it to buy any homes, and that it will be several years before the runway is in routine use.
The scheme you can apply to now
- It covers eligible homes across Surrey, Sussex and Kent inside a boundary set by aircraft noise levels. Gatwick extended it to a further 985 homes and drew the boundary around whole roads and villages.
- Eligible homes can get up to £4,300 plus VAT towards double glazing for windows and doors.
- You can top up the package at the same rates if you want more done.
- Check whether your address is inside the boundary on Gatwick’s aircraft noise website.
The new scheme for the Northern Runway
- It opens shortly after construction work starts on the airfield. Gatwick hasn’t given a date yet.
- Gatwick will write to eligible homeowners when it opens, starting with homes in the noisiest areas.
- Its proposals offered a tiered package, with more help for homes with more noise, and added schemes for schools and nurseries, and for people who want to move.
- You can still apply under the new scheme if your home was insulated under the current one.
Planning other work around it
If you live near the airport and you’re planning new windows, a loft conversion or an extension, a little planning avoids paying twice:
- Check your eligibility before you order windows. If you qualify, use the grant towards the windows you were going to buy anyway.
- Ask for acoustic glazing. Laminated acoustic glass, panes of different thicknesses and good seals cut aircraft noise much more than standard double glazing.
- Don’t forget ventilation. Replacement windows still have to meet the ventilation rules. Acoustic trickle vents let air in without letting the noise in.
- Roofs and rooflights matter. In a loft conversion or an extension with a flat roof, dense mineral wool insulation, extra plasterboard layers and acoustic rooflight glass all help.
- Use a registered installer (FENSA or CERTASS, for example) so the windows are signed off under Building Regulations.
See our loft conversions and extensions pages for how we plan these jobs, and the 2026 energy rules for the insulation standards.
Questions people ask
How do I know if my home is eligible?
Gatwick publishes the scheme boundary on its aircraft noise website. If your address is inside it, you can apply under the current scheme now.
Does the grant cover the full cost of new windows?
Not always. The current scheme pays up to £4,300 plus VAT, and you can top up at the same rates for more windows or doors.
I had windows done under the old scheme. Can I apply again?
Yes. Gatwick says homes that benefited from the existing scheme can still apply for further help under the new one.
Planning a loft conversion or an extension near the airport? We’ll specify the glazing and insulation with noise in mind. Book a survey visit or call 07802 758763.
Sources
- London Gatwick: Future plans and the new noise insulation scheme
- London Gatwick: Reducing noise
- Gatwick aircraft noise: Noise insulation scheme boundary
- London Gatwick: Northern Runway
Last checked: 27 November 2026. Rules, grants and fees change; check the linked sources before you rely on them.
