
House extensions in Reigate, Redhill and the RH area
Single-storey rear and side extensions, wraparounds and two-storey extensions, built to sit comfortably with your house and your street.
Extensions we build
Most extensions are about making the ground floor work better: a kitchen-diner that opens onto the garden, a side return that turns a dark galley kitchen into a proper room, or a two-storey extension that adds a bedroom above a bigger living space.
- Single-storey rear extensions, often with a roof lantern or rooflights
- Side return and wraparound extensions for Victorian and Edwardian houses
- Two-storey side and rear extensions
- Garage conversions and porches
Matching the house
Many houses in the RH area are brick below and clay tile-hanging above, often with handmade tiles that have weathered for a century. An extension that matches the bricks, the tiles and the roof pitch looks as if it was always there. We source matching or reclaimed materials where we can, and say so in the quote where we can’t.
Planning permission and Building Regulations
Many single-storey rear extensions are permitted development: up to 3 metres beyond the original rear wall for a semi-detached or terraced house, or 4 metres for a detached house, and no more than 4 metres high. With prior approval from the council, those limits rise to 6 and 8 metres. Side extensions under permitted development must be single storey and no wider than half the original house.
Those rights are reduced in conservation areas and the Surrey Hills National Landscape, and some streets have Article 4 directions that remove them. Almost every extension also needs Building Regulations approval, and digging foundations near a neighbour’s house usually means a party wall notice. We’ll tell you which apply at the survey visit.
Every extension quote covers
- Groundworks, drainage and foundations
- Structure, steels and roof
- Windows, doors, rooflights and glazing
- Electrics, plumbing and heating
- Plastering, flooring and decoration
- Building control inspections and certificate
- What’s excluded, in writing
Talk to us about your project
Book a survey visit, call or send a WhatsApp.
Types of extension
Which extension suits your house?
Rear extensions
Kitchen-diners that open onto the garden, with bifolds and roof lanterns.
Side returns
Fill the side alley of a Victorian or Edwardian house and double the kitchen.
Two-storey extensions
A bigger living space below and an extra bedroom above.
In pictures
Extensions
Photos show the kind of work involved. See our own jobs on the Projects page.
Questions
Common questions
About extensions in the RH area.
How long does a single-storey extension take to build?
Most take somewhere between 10 and 16 weeks on site, depending on size, foundations and how long the glazing takes to make. Your quote includes a programme, and we’ll update it if anything changes.
Can we live at home while the extension is built?
Usually, yes. The work area is sealed off, and the knock-through into the house is left as late as possible so you’re without a kitchen for the shortest time.
Do I need an architect?
You’ll need drawings for planning or Building Regulations, and a structural engineer’s calculations for steels and foundations. If you don’t have a designer yet, we can suggest local architects and engineers.
Book a survey visit
Tell us about your project
Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.




