Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Building and maintenance services

Everything from a new extension to a slipped roof tile, for homes across Reigate, Redhill and the RH area.

What we do

Six services, one team

The same team handles the work, the trades and the paperwork, so you have one point of contact from the survey to the sign-off.

Open-plan kitchen and living room in a modern extension

Extensions

Single-storey, side return, wraparound and two-storey extensions built to match your house.

Find out more about extensions

Finished loft room with roof windows and a timber floor

Loft conversions

Rooflight, dormer and hip-to-gable conversions, from steels and stairs to the last coat of paint.

Find out more about loft conversions

Long fitted kitchen with new units and worktops

Kitchens and bathrooms

Strip-out, plumbing, electrics, plastering, tiling and fitting, handled by one team.

Find out more about kitchens and bathrooms

Plasterer skimming a wall during a house renovation

Renovations

Whole-house refurbishments, knock-throughs and careful repairs to period homes.

Find out more about renovations

Tradesman with a tool belt ready for a repair job

Maintenance and repairs

Repairs for homeowners, landlords and letting agents, from leaks and rot to doors and gutters.

Find out more about maintenance and repairs

Roofer laying clay roof tiles

Roofing and exterior

Tile-hanging and roof repairs, flat roofs, gutters, fascias, chimneys and repointing.

Find out more about roofing and exterior

How it works

How a job runs

A typical extension or refurbishment, from first call to final snag.

  1. Visit and survey We see the job, measure up and talk through what you want, a likely budget and what needs approval.
  2. Written quote An itemised price with a start date, a programme and a list of anything not included.
  3. Approvals and booking Planning, Building Regulations and party wall notices are lined up before the start date.
  4. The build A weekly update from your contact, and an early call if anything affects the price or the dates.
  5. Sign-off We walk the finished job with you, put right any snags and hand over the completion paperwork.

Get in touch

Your project is our business.

Tell us what you’re planning. We’ll visit, measure up and give you a written, itemised quote.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy