
Roof and exterior repairs in the RH area
Clay tile-hanging and roof repairs, flat roofs, gutters, fascias, chimneys and brickwork, done properly from safe access.
What we repair and replace
- Clay tile-hanging: slipped, cracked and missing tiles, and re-hanging whole walls
- Pitched roofs: tiles, ridges, valleys and lead flashings
- Flat roofs in EPDM rubber or GRP fibreglass
- Gutters, downpipes, fascias and soffits
- Chimney repointing, flaunching and leadwork
- Brick repointing and render repairs
Tile-hanging, done to match
Hung clay tiles, plain and decorative fishscale, are a big part of what makes houses in Surrey and Sussex look the way they do. Replacements in the wrong colour or size stand out for decades. We match handmade and machine-made tiles from reclaimed stock where we can, and fix them with the right nails and battens so they stay put.
Access and permissions
Most roof work needs scaffolding, which is safer and often quicker than working from ladders. If the scaffold or a skip has to stand on the pavement or road, it needs a licence from the highway authority: Surrey County Council or West Sussex County Council in the RH area. We arrange it as part of the job.
Every roofing quote covers
- Scaffolding and any licence it needs
- Materials, with matching or reclaimed tiles noted
- Leadwork and flashings
- Removal of waste
- Photos of the finished work
- Notes on anything we found but didn’t price
Talk to us about your project
Book a survey visit, call or send a WhatsApp.
In pictures
Roofing and exterior
Photos show the kind of work involved. See our own jobs on the Projects page.
Questions
Common questions
About roofing and exterior in the RH area.
Can you match old clay tiles?
Usually. On older houses, reclaimed tiles weathered to a similar colour are the closest match. For larger areas we’ll show you samples before ordering.
Do I need scaffolding for a small roof repair?
Not always. Some repairs can be done safely from a roof ladder or a tower. Where the work is high, long or near an edge, scaffolding is the safe option, and the quote will explain why.
My flat roof is leaking. Repair or replace?
If the leak comes from one split or a failed joint on a fairly young roof, a repair usually makes sense. If the covering is blistered and cracked all over, or the deck feels soft underfoot, replacing it in EPDM or GRP is better value over time.
Book a survey visit
Tell us about your project
Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.





