Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Builders in Reigate, Redhill and the RH area

Extensions, renovations and repairs, built properly

From a new kitchen extension to a slipped roof tile, Bloom Building & Maintenance looks after homes across Surrey and West Sussex. One team, a written quote and a tidy site.

  • Written, itemised quotes
  • One point of contact
  • Tidy, protected sites
  • Local to the RH area

Planning an extension, loft or renovation?

Book a survey visit and get a written, itemised quote.

Plans and drawings for a new house extension
A builder and a homeowner shaking hands beside a yellow hard hat

Your project
is our business.

About Bloom

Building and maintenance for homes across the RH area

Bloom Building & Maintenance Ltd builds extensions, loft conversions, kitchens and bathrooms, and looks after the houses around them afterwards: the repairs, roofs and gutters that keep a good house in good order.

We work for homeowners, landlords and letting agents in Reigate, Redhill, Dorking, Horley and the villages around them, so we know the local councils, the local houses and the local suppliers.

  • A written, itemised quote before anything starts
  • One person to talk to from survey to sign-off
  • Planning, Building Regulations and party walls lined up for you
  • Tidy, protected sites, cleared at the end of each day

What we do

Our services

From a new extension to a slipped roof tile, the same team handles the work, the trades and the paperwork.

Open-plan kitchen and living room in a modern extension

Extensions

Single-storey, side return, wraparound and two-storey extensions built to match your house.

Find out more about extensions

Finished loft room with roof windows and a timber floor

Loft conversions

Rooflight, dormer and hip-to-gable conversions, from steels and stairs to the last coat of paint.

Find out more about loft conversions

Long fitted kitchen with new units and worktops

Kitchens and bathrooms

Strip-out, plumbing, electrics, plastering, tiling and fitting, handled by one team.

Find out more about kitchens and bathrooms

Plasterer skimming a wall during a house renovation

Renovations

Whole-house refurbishments, knock-throughs and careful repairs to period homes.

Find out more about renovations

Tradesman with a tool belt ready for a repair job

Maintenance and repairs

Repairs for homeowners, landlords and letting agents, from leaks and rot to doors and gutters.

Find out more about maintenance and repairs

Roofer laying clay roof tiles

Roofing and exterior

Tile-hanging and roof repairs, flat roofs, gutters, fascias, chimneys and repointing.

Find out more about roofing and exterior

How it works

How a job runs

A typical extension or refurbishment, from first call to final snag.

  1. Visit and survey We see the job, measure up and talk through what you want, a likely budget and what needs approval.
  2. Written quote An itemised price with a start date, a programme and a list of anything not included.
  3. Approvals and booking Planning, Building Regulations and party wall notices are lined up before the start date.
  4. The build A weekly update from your contact, and an early call if anything affects the price or the dates.
  5. Sign-off We walk the finished job with you, put right any snags and hand over the completion paperwork.
Open-plan kitchen and living room in a modern extension

Our speciality

Extensions built to suit your house

Most extensions are about making the ground floor work better. We build them to match the bricks, tiles and roof lines of the house, and line up the planning, Building Regulations and party wall notices before we start.

Rear extensions

Kitchen-diners that open onto the garden, with bifolds and roof lanterns.

Side returns

Fill the side alley of a Victorian or Edwardian house and double the kitchen.

Two-storey extensions

A bigger living space below and an extra bedroom above.

Get in touch

Your project is our business.

Tell us what you’re planning. We’ll visit, measure up and give you a written, itemised quote.

Why Bloom

What you can expect

Written, itemised quotes

Every line priced, with what’s included and what isn’t, before work starts.

One point of contact

The same person from the survey visit to sign-off, on the phone or WhatsApp.

Approvals lined up

Planning, Building Regulations and party wall notices sorted before the start date.

Tidy, protected sites

Floors covered, dust sheeted and cleared at the end of each day.

Weekly updates

A short update every week, and an early call if anything changes the price or dates.

Local to the RH area

Based around Reigate and Redhill, working across Surrey and West Sussex.

Where we work

Areas we cover

The RH postcode area of Surrey and West Sussex. If you’re just outside it, ask anyway.

  • RH1 Redhill, Merstham, Earlswood, Bletchingley
  • RH2 Reigate, Woodhatch, Reigate Heath
  • RH3 Betchworth, Brockham
  • RH4 Dorking, Westcott
  • RH5 Capel, Holmwood, Beare Green, Newdigate
  • RH6 Horley, Smallfield, Charlwood
  • RH7 Lingfield, Dormansland
  • RH8 Oxted, Limpsfield, Hurst Green
  • RH9 Godstone, South Godstone
  • RH10 Crawley east, Three Bridges, Copthorne
  • RH11 Crawley west, Ifield, Broadfield
  • RH12 Horsham, Warnham, Broadbridge Heath

Read our reviews on Google

Reviews from our customers are on our Google Business Profile, where we can’t edit or choose them.

From the blog

Building news and guides for the RH area

Planning changes, grants, costs and looking after older homes across Sussex and Surrey, in plain English.

Questions

Questions we’re often asked

Can’t see yours? Ask us when you get in touch.

Which areas do you cover?

The RH postcode area: Reigate, Redhill, Merstham, Dorking, Horley, Oxted, Godstone, Lingfield, Crawley, Horsham and the villages in between. If you’re just outside it, ask us anyway.

How do I get a quote?

Book a survey visit with the form on this page, call or send us a WhatsApp. We’ll see the job, measure up and send a written, itemised quote afterwards.

Do I need planning permission for a single-storey extension?

Often not. Under permitted development, a single-storey rear extension can usually go up to 3 metres beyond the original rear wall of a semi-detached or terraced house, or 4 metres for a detached house, and no higher than 4 metres. Larger ones, up to 6 or 8 metres, need prior approval from the council.

These rights are reduced in conservation areas and the Surrey Hills National Landscape, so check with your council before you commit.

Will my project need Building Regulations approval?

Most extensions, loft conversions and structural alterations do, even when planning permission isn’t needed. Approval comes from the council’s building control team or a registered building control approver, who inspect the work at key stages and issue a completion certificate. Keep it safe: you’ll need it when you sell.

What is a party wall notice, and do I need one?

If you’re working on a wall you share with a neighbour, building on the boundary, or digging foundations within 3 metres of their building (or 6 metres for deeper foundations), the Party Wall etc. Act 1996 says you must give them written notice first: two months before work on a shared wall, and one month for new boundary walls and excavations.

Do you take on small repair jobs?

Yes. Maintenance is half of our name. Leaks, rotten timber, slipped tiles, sticking doors and blocked gutters are all worth sorting before they turn into bigger jobs.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy