Short answer: a rooflight conversion is the simplest, a rear dormer adds the most usable floor space for the money, and a hip-to-gable suits semi-detached and detached houses with a sloping side roof. Check you have at least 2.2m of head height at the ridge before you start.
The three main types
| Type | Best for | What changes |
|---|---|---|
| Rooflight (Velux) | Lofts that already have good head height | Windows set into the existing roof slope, a new floor and stairs |
| Rear dormer | Terraced and semi-detached houses | A box-shaped extension off the rear roof slope, giving full-height walls |
| Hip-to-gable | Semi-detached and detached houses with a hipped roof | The sloping side roof is built up into a vertical gable wall, often combined with a rear dormer |
Planning rules for lofts
Many loft conversions are permitted development under Class B, within limits: up to 40 cubic metres of extra roof space for a terraced house and 50 cubic metres for a semi-detached or detached house; nothing higher than the existing ridge; no dormers on the roof slope facing the road at the front; and side windows obscure-glazed. They don’t apply on Article 2(3) land such as conservation areas and National Landscapes. The Planning Portal loft guide shows each rule.
Building Regulations matter more
- Structure: new floor joists and usually steel beams, designed by a structural engineer.
- Fire safety: a protected escape route down through the house, fire doors on the stair, and mains-wired smoke alarms.
- Stairs: a permanent staircase with enough head height; a loft ladder doesn’t count for a habitable room.
- Insulation and ventilation: to current Part L and Part F standards.
- Party walls: on terraced and semi-detached houses, steels in the party wall need a party structure notice.
Questions people ask
How much head height do I need?
Measure from the top of the ceiling joists to the underside of the ridge. Around 2.2m or more usually works; less than that often means a dormer or raising the roof, which needs planning permission.
Do I need to move out during a loft conversion?
Usually not. Most of the work happens from scaffolding and through the roof, and the stairs are opened up near the end.
Can I add an en-suite in the loft?
Often, yes, if the soil pipe can reach it. We check the drainage route at the survey.
Wondering what your loft could become? Book a survey visit or call 07802 758763.
Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.
