
Loft conversions in the RH area
Rooflight, dormer and hip-to-gable conversions that add a bedroom, a bathroom or a quiet place to work, without giving up any of the garden.
Types of loft conversion
- Rooflight conversions. Windows set into the existing roof slope. The least disruptive option, if there’s already enough headroom.
- Rear dormers. A box-shaped extension on the back slope that adds full headroom and floor space. The most common type on semis and terraces.
- Hip-to-gable. The sloping side of a hipped roof is built up into a vertical gable wall, often alongside a rear dormer.
- Mansard. A steeper rebuild of the roof slope. It usually needs full planning permission.
Is my loft suitable?
Measure from the top of a ceiling joist to the underside of the ridge timber. Around 2.2 metres or more is a common rule of thumb for a comfortable conversion; less can still work with a dormer or by lowering the ceiling below. The roof structure matters too: older cut-timber roofs are easier to open up than modern trussed rafters.
Planning, Building Regulations and party walls
Many loft conversions are permitted development, as long as the extra roof space is no more than 40 cubic metres for a terraced house or 50 cubic metres for other houses, nothing rises above the existing ridge, and nothing extends beyond the roof slope at the front of the house. Conservation areas and the Surrey Hills National Landscape are stricter.
Every loft conversion needs Building Regulations approval, covering the floor structure, a safe staircase, fire protection to the escape route, insulation and ventilation. In a semi or a terrace you’ll usually need party wall notices too, because steels often bear on the shared wall.
Every loft quote covers
- Structural design and steels
- New floor, insulation and fire protection
- A staircase that meets Building Regulations
- Dormer, rooflights and windows
- Electrics, heating and any en-suite plumbing
- Plastering and decoration
- Building control and party wall notices
Talk to us about your project
Book a survey visit, call or send a WhatsApp.
In pictures
Loft conversions
Photos show the kind of work involved. See our own jobs on the Projects page.
Questions
Common questions
About loft conversions in the RH area.
Do I need planning permission for a loft conversion?
Often not. Most rooflight, rear dormer and hip-to-gable conversions are permitted development if they stay within the volume limits (40 cubic metres for terraced houses, 50 for others) and don’t extend beyond the front roof slope. Mansards, front dormers and homes in conservation areas usually need permission.
How long does a loft conversion take?
A rear dormer conversion typically takes around 6 to 10 weeks. Much of the early work happens from scaffolding outside, so the house below stays usable for most of the build.
Will I need a party wall agreement?
In a semi or a terrace, probably. Cutting into or putting steels on a shared wall needs two months’ written notice to your neighbour under the Party Wall etc. Act 1996. If they agree in writing you can go ahead; if not, a party wall surveyor draws up an award.
Book a survey visit
Tell us about your project
Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.





