Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Services

Kitchen and bathroom fitting in the RH area

Kitchens, family bathrooms, en-suites and cloakrooms, with the strip-out, plumbing, electrics, plastering, tiling and fitting handled by one team.

One team, one programme

A kitchen or bathroom involves five or six trades, each waiting on the last. We plan the order, book the trades and keep the programme, so the plasterer isn’t standing in an unfinished room and you aren’t the one making the calls.

  • Kitchen strip-out, alterations and fitting, including knock-throughs for a kitchen-diner
  • Family bathrooms, en-suites, cloakrooms and wet rooms
  • Underfloor heating, tiling, worktops and splashbacks
  • Fitting kitchens and bathrooms you’ve bought, or sourcing them for you

The rules worth knowing

New circuits, consumer unit changes and electrical work near a bath or shower are notifiable under Part P of the Building Regulations, so they must be done and certified by a registered electrician. Moving a toilet or adding an en-suite can mean new drainage, which also needs Building Regulations approval. Taking out a load-bearing wall between kitchen and dining room needs a steel beam, structural calculations and building control sign-off.

Every kitchen or bathroom quote covers

  • Strip-out and waste removal
  • Plumbing and drainage alterations
  • Electrics, with certificates
  • Plastering and making good
  • Tiling and flooring
  • Fitting, sealing and finishing
  • Which items you supply and which we do

Talk to us about your project

Book a survey visit, call or send a WhatsApp.

Questions

Common questions

About kitchens and bathrooms in the RH area.

How long does a bathroom refit take?

Usually between one and three weeks from strip-out to finished room. Wet rooms, moved soil pipes and large-format tiles add time.

Can you fit a kitchen I’ve bought myself?

Yes. We’ll check the plan and the order list before delivery, because missing fillers, end panels and plinths are the most common cause of delays.

Will we be without a kitchen for long?

We plan the work to keep that as short as possible, and can set up a temporary sink and worktop elsewhere in the house while the new kitchen goes in.

Get in touch

Your project is our business.

Tell us what you’re planning. We’ll visit, measure up and give you a written, itemised quote.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy