Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Services

House renovations and refurbishments in the RH area

Whole-house refurbishments, knock-throughs and repairs to older homes, planned so the structure, services and finishes happen in the right order.

What a renovation usually involves

  • Knocking through and opening up rooms, with steels and building control sign-off
  • Rewiring, replumbing and new heating, coordinated with the building work
  • Replastering, new floors, joinery and decoration
  • Structural repairs: lintels, cracked brickwork and failed timbers
  • Repairs to period features: sash windows, cornicing, fireplaces and timber floors

Older houses need the right materials

Victorian and Edwardian houses, and the older tile-hung cottages across Surrey and Sussex, were built with solid walls and soft lime mortar. They manage moisture by letting it breathe out. Cement render, gypsum plaster and plastic paints trap it, which is how damp and decay start. On older buildings we use lime mortars, lime plasters and breathable paints where they belong.

Listed buildings and conservation areas

If your home is listed, most alterations inside and out need listed building consent, and starting work without it is a criminal offence. In conservation areas, demolition and some changes to the outside of a house need planning permission. Speak to your council’s conservation officer early; we’re happy to come to that meeting.

Every renovation quote covers

  • A survey of the structure and services before pricing
  • The order of works and a programme
  • Structural work and building control
  • Electrics, plumbing and heating
  • Plastering, joinery and floors
  • Decoration and making good
  • Provisional sums for hidden defects, explained

Talk to us about your project

Book a survey visit, call or send a WhatsApp.

Questions

Common questions

About renovations in the RH area.

Do I need Building Regulations approval to remove a wall?

If the wall is load-bearing, yes. You’ll need a structural engineer’s calculations for the beam and its supports, and building control will inspect the work. Non-structural partitions don’t usually need approval, but check first: walls that look light can still carry floor joists.

Should we move out during a renovation?

For a whole-house refurbishment with a full rewire and new heating, moving out for part of the job usually makes it quicker and cheaper. For a room-by-room renovation most people stay. We’ll talk through the options at the survey.

What if you find problems once work starts?

In older houses it happens: rotten joists under a floor, or a lintel that isn’t there. We’ll stop, show you, explain the options and price them before doing anything extra.

Get in touch

Your project is our business.

Tell us what you’re planning. We’ll visit, measure up and give you a written, itemised quote.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy