
Property maintenance and repairs in the RH area
Repairs and planned maintenance for homeowners, landlords and letting agents, from a leaking gutter to a full refresh between tenants.
Jobs we’re called out for
- Leaks, damp and condensation, traced to their cause
- Rotten timber in windows, doors, fascias and floors
- Doors and windows that stick, drop or won’t lock
- Gutter clearing and repairs, downpipes and drains
- Brick repointing, garden walls and fencing
- Tiling, sealant, plastering and decorating repairs
For landlords and letting agents
We handle repairs reported by tenants, refresh properties between lets, and look after portfolios on a planned maintenance schedule, with photos before and after each job.
A reminder for private landlords in England: gas safety checks are due every 12 months, by a Gas Safe registered engineer, and an electrical installation condition report (EICR) at least every five years, by a qualified electrician.
Little and often
Most expensive repairs start as cheap ones. An autumn gutter clear, a few replaced tiles and some repointing stop water getting into walls and timbers, which is where the real cost lies.
Every repair visit includes
- The cause explained, not just the symptom
- A price before work starts, where the job can be fully seen
- Photos of the finished repair
- A note of anything else we spotted
Talk to us about your project
Book a survey visit, call or send a WhatsApp.
In pictures
Maintenance and repairs
Photos show the kind of work involved. See our own jobs on the Projects page.
Questions
Common questions
About maintenance and repairs in the RH area.
Do you take on small jobs?
Yes. Maintenance is half of our name, and a small repair now often saves a much bigger one later.
Do you work for landlords and letting agents?
Yes. We can take instructions from your agent, arrange access with tenants, and send photos and the invoice to whoever manages the property.
How quickly can you come out?
It depends on the job and the time of year. Tell us what’s happening, in the form or on the phone, and we’ll give you an honest answer about when we can get there.
Book a survey visit
Tell us about your project
Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.





