Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Services

Roof and exterior repairs in the RH area

Clay tile-hanging and roof repairs, flat roofs, gutters, fascias, chimneys and brickwork, done properly from safe access.

What we repair and replace

  • Clay tile-hanging: slipped, cracked and missing tiles, and re-hanging whole walls
  • Pitched roofs: tiles, ridges, valleys and lead flashings
  • Flat roofs in EPDM rubber or GRP fibreglass
  • Gutters, downpipes, fascias and soffits
  • Chimney repointing, flaunching and leadwork
  • Brick repointing and render repairs

Tile-hanging, done to match

Hung clay tiles, plain and decorative fishscale, are a big part of what makes houses in Surrey and Sussex look the way they do. Replacements in the wrong colour or size stand out for decades. We match handmade and machine-made tiles from reclaimed stock where we can, and fix them with the right nails and battens so they stay put.

Access and permissions

Most roof work needs scaffolding, which is safer and often quicker than working from ladders. If the scaffold or a skip has to stand on the pavement or road, it needs a licence from the highway authority: Surrey County Council or West Sussex County Council in the RH area. We arrange it as part of the job.

Every roofing quote covers

  • Scaffolding and any licence it needs
  • Materials, with matching or reclaimed tiles noted
  • Leadwork and flashings
  • Removal of waste
  • Photos of the finished work
  • Notes on anything we found but didn’t price

Talk to us about your project

Book a survey visit, call or send a WhatsApp.

Questions

Common questions

About roofing and exterior in the RH area.

Can you match old clay tiles?

Usually. On older houses, reclaimed tiles weathered to a similar colour are the closest match. For larger areas we’ll show you samples before ordering.

Do I need scaffolding for a small roof repair?

Not always. Some repairs can be done safely from a roof ladder or a tower. Where the work is high, long or near an edge, scaffolding is the safe option, and the quote will explain why.

My flat roof is leaking. Repair or replace?

If the leak comes from one split or a failed joint on a fairly young roof, a repair usually makes sense. If the covering is blistered and cracked all over, or the deck feels soft underfoot, replacing it in EPDM or GRP is better value over time.

Get in touch

Your project is our business.

Tell us what you’re planning. We’ll visit, measure up and give you a written, itemised quote.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy