Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Blog

Conservation areas in Horsham, Reigate, Dorking and East Grinstead: what needs permission

A terrace of period houses with sash windows and chimneys inside a dashed conservation area boundary

Short answer: in a conservation area, permitted development rights are narrower: side extensions, rear extensions over one storey, cladding and roof extensions need planning permission. Demolishing most buildings needs permission too, and you must give the council 6 weeks’ notice before working on trees. An Article 4 direction can go further and bring windows, doors, porches and painting under control.

Where they are

Most historic town centres in the area are conservation areas, including Horsham, Reigate, Dorking and East Grinstead. So are many surrounding streets and village centres. In Horsham alone, there are separate conservation areas for the town centre, London Road, Richmond Road and Park Terrace Gardens, plus villages such as Slinfold, Billingshurst and Storrington. Each council publishes its conservation area maps and appraisals online.

What needs permission

Horsham District Council’s guidance says planning permission may be needed to clad a building, alter the roof, alter windows and external doors, or add solar panels in a conservation area. In general:

  • Extensions: side extensions and rear extensions of more than one storey need planning permission. Single-storey rear extensions can still be permitted development within the size limits (3 m on a semi or terrace, 4 m detached).
  • Roofs: dormers and other roof extensions need permission.
  • Cladding: adding stone, render, timber, plastic or tiles to outside walls needs permission.
  • Demolition: knocking down a building over 115 m³, or a wall or fence over 1 m next to a road (2 m elsewhere), needs planning permission.
  • Trees: tell the council 6 weeks before cutting back or felling a tree with a trunk 75 mm or more across, measured 1.5 m above the ground.

Article 4 directions

Some conservation areas have an Article 4 direction that removes more permitted development rights, often for changes to the front of houses: windows, doors, porches, front walls, roof materials and painting. Slinfold’s conservation area is one example in Horsham district. Councils publish Article 4 maps, and Horsham’s are available as open data.

Listed buildings

If your home is listed, you need listed building consent for most changes inside and out, including like-for-like repairs that alter historic fabric. Carrying out work without consent is a criminal offence, so always check first.

Getting a good result

  • Repair before you replace: timber sash windows, handmade clay tiles, tile-hanging and Horsham stone roofs can usually be repaired.
  • Match the materials: lime mortar on old brickwork, clay tiles that match in colour and size, and joinery profiles to match the originals.
  • Include a heritage statement: applications that affect a conservation area need to explain the area’s significance and how the design respects it.
  • Upgrade energy carefully: secondary glazing, draught-proofing and loft insulation usually need no permission and make a big difference.

Questions people ask

Can I replace my windows in a conservation area?

If there’s no Article 4 direction and the house isn’t listed, replacing windows on a house is usually permitted development. With an Article 4 direction or a listed building, you need permission or consent.

Do I need permission to paint the outside of my house?

Usually not, unless an Article 4 direction covers painting, or the building is listed.

How do I know if I’m in a conservation area?

Check your council’s conservation area maps, or ask the planning team. The search your solicitor did when you bought the house will also say.

We repair and extend period homes using matching materials (see renovations and roofing and exterior). Book a survey visit or call 07802 758763.

Sources

Last checked: 27 November 2026. Rules, grants and fees change; check the linked sources before you rely on them.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy