Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Blog

Extensions and the 2026 energy rules: Part L, heat pump grants and 0% VAT

Air source heat pump fixed to the brick wall of a house

Short answer: new Building Regulations for energy were laid in March 2026 and mainly raise the bar for new homes. An extension still has to meet Part L standards for insulation and glazing. If you’re building anyway, it’s a good moment to add insulation, solar panels or a heat pump; a heat pump can get a £7,500 Boiler Upgrade Scheme grant.

What changed in 2026

On 24 March 2026 the government laid The Building Regulations etc. (Amendment) (England) Regulations 2026 and published new Approved Documents L and F, often called the Future Homes and Buildings Standards. They are aimed mostly at new homes: low-carbon heating and on-site renewable electricity. Industry guidance expects them to take effect in March 2027, with transitional arrangements. See the government’s Building Circular 01/2026.

What it means for an extension

  • New walls, floors, roofs, windows and doors must meet the Part L limits for heat loss (U-values).
  • Large areas of glazing can need extra calculations, or better insulation elsewhere to compensate.
  • Extensions must be properly ventilated, and an extractor fan in a new kitchen or bathroom is normal.
  • Your building control body tells you which version of the rules your project is checked against. It depends on when the work is notified and started.

Grants and tax breaks worth knowing

SchemeWhat you can getUntil
Boiler Upgrade Scheme£7,500 towards an air source or ground source heat pump; £2,500 for an air-to-air heat pumpCurrently due to run to 2028
Boiler Upgrade Scheme (off the gas grid)£9,000 for eligible homes replacing oil or LPG heating31 March 2027
0% VAT on energy-saving materialsInstalled insulation, heat pumps and solar panels31 March 2027

Your installer applies for the Boiler Upgrade Scheme grant. See Ofgem and the Energy Saving Trust for eligibility.

Doing it at the same time

  • Insulate the existing walls or floor you open up while the builders are there.
  • Size the radiators or underfloor heating for a future heat pump, even if you keep the boiler for now.
  • Plan solar panels on a new flat or pitched roof before it’s finished.
  • Leave space and a power supply outside for a heat pump unit.

Questions people ask

Does my extension need a heat pump?

No. The new rules focus on new homes. An extension can be heated from your existing system, as long as it meets the Part L standards.

Does a heat pump need planning permission?

Many air source heat pumps on houses are permitted development, within limits on size and position. Check the Planning Portal before installing.

Is underfloor heating worth it in an extension?

It works well with large glazed extensions and with heat pumps, because it heats at lower temperatures. It needs a good insulated floor build-up.

Want your extension built warm from the start? Book a survey visit or call 07802 758763.

Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy