Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Blog

Heat pump grants and 0% VAT: what to sort out before April 2027

A house with solar panels and an air source heat pump, a zero per cent badge and a pound coin

Short answer: the Boiler Upgrade Scheme pays £7,500 towards an air source or ground source heat pump. Homes off the gas grid that are replacing oil or LPG heating can get £9,000 until March 2027. Separately, installing insulation, solar panels and heat pumps in a home is zero-rated for VAT until 31 March 2027; from 1 April 2027 it goes up to 5%.

The Boiler Upgrade Scheme

SystemGrant
Air source heat pump£7,500
Air source heat pump replacing oil or LPG in an off-gas home (until March 2027)£9,000
Ground source or water source heat pump£7,500
Air-to-air heat pump£2,500
Biomass boiler (rural, off-gas homes only)£5,000
  • It’s for homeowners in England and Wales replacing fossil fuel heating, with one grant per property.
  • Your MCS-certified installer applies for the grant and takes it off your bill.
  • New-build homes aren’t eligible.
  • The government has confirmed £400 million a year for the scheme until the end of March 2028.

Plenty of homes in the villages of the Weald and the Surrey Hills aren’t on mains gas, so the £9,000 rate for oil and LPG homes is worth checking before March.

0% VAT on energy-saving materials

Fitting qualifying energy-saving materials in a home is zero-rated until 31 March 2027. That includes insulation, solar panels, heat pumps and batteries. From 1 April 2027 the rate goes back to 5%. The zero rate covers installing those materials. The rest of the building work, such as the walls and roof of a new extension, is charged at the standard 20%.

Planning a heat pump alongside an extension

  • Insulate first. A new extension already has to meet the Part L energy standards (the 2026 energy rules), and better insulation in the existing house lets a smaller heat pump do the job.
  • Design the heating for low temperatures. Underfloor heating in an extension works well with a heat pump. In older rooms, larger radiators may be needed.
  • Leave room for a hot water cylinder. A heat pump needs one, so plan a cupboard in the extension, on the landing or in a converted loft.
  • Choose where the outdoor unit goes. Most air source heat pumps on houses are permitted development, within size and position rules. Listed buildings and some positions in conservation areas need permission.
  • Check the electrics. A heat pump, an induction hob and an EV charger together can mean a new consumer unit or a bigger supply.

If your household income is low, ask your council whether you qualify for Warm Homes: Local Grant funding, which can cover insulation and heating upgrades.

Timing tips

  • MCS installers get busy in winter, so book a survey early if you want work finished before March.
  • If you’re adding insulation or solar panels, aim to have them installed by 31 March 2027 to get the 0% rate.
  • If an extension is on the way, fit the heat pump once the extension is weathertight, so it’s sized for the finished house. See how long an extension takes.

Questions people ask

Can I get the grant for a heat pump in a new extension?

The grant is per property for replacing fossil fuel heating, so it can cover a heat pump that heats the whole house, extension included. It isn’t available for new-build homes.

Does the 0% VAT rate apply to my builder’s bill?

Only to installing qualifying energy-saving materials such as insulation, solar panels and heat pumps. General building work is standard-rated.

Will the £9,000 rate continue after March 2027?

It’s due to end in March 2027. The government hasn’t said it will be extended.

Planning an extension or renovation and want it ready for a heat pump? We’ll design the heating, insulation and cylinder space in from the start. Book a survey visit or call 07802 758763.

Sources

Last checked: 27 November 2026. Rules, grants and fees change; check the linked sources before you rely on them.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy