Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Blog

Do I need planning permission for an extension? The 2026 rules in plain English

Architect's drawings and plans for a house laid out on a desk

Short answer: often not, for a modest single-storey extension on a house. England’s permitted development rights allow some extensions without a planning application, within set limits. Flats, maisonettes, listed buildings and houses in conservation areas or National Landscapes have fewer or no rights, and every extension still needs Building Regulations approval.

What permitted development allows

The rules are in Schedule 2, Part 1, Class A of the General Permitted Development Order 2015, as amended. For a house that hasn’t lost its rights, the main limits for extensions are:

  • Single-storey rear extension: up to 3m deep on an attached house, 4m on a detached house, measured from the original rear wall.
  • Larger rear extension: up to 6m (attached) or 8m (detached) through the prior approval scheme. You notify the council, it consults your neighbours, and you wait for its decision before you start.
  • Height: no more than 4m for a single-storey extension, and no more than 3m to the eaves within 2m of a boundary.
  • Side extension: single storey, no more than 4m high and no wider than half the original house.
  • Two-storey rear extension: up to 3m deep and at least 7m from the rear boundary.
  • Coverage: extensions and outbuildings together can cover no more than half the garden around the original house.
  • Materials: similar in appearance to the existing house.

“Original house” means the house as it was first built, or as it stood on 1 July 1948. Earlier extensions count against your allowance. The Planning Portal extensions guide and the government’s technical guidance have diagrams of each rule.

The exceptions that catch people out locally

  • National Landscapes. Parts of the RH area sit in the Surrey Hills and High Weald National Landscapes (formerly AONBs). On this “Article 2(3) land”, side extensions and two-storey rear extensions always need planning permission.
  • Conservation areas and Article 4 directions. Reigate, Dorking and many village centres have conservation areas, and some streets have Article 4 directions that remove specific rights.
  • Flats and maisonettes have no householder permitted development rights.
  • Planning conditions. Many newer estates had permitted development rights removed when they were built. Check the original planning permission.
  • Green Belt doesn’t remove permitted development rights, but if you do need a planning application, councils judge whether the extension is “proportionate” to the original house.

Get it in writing

If your extension fits permitted development, apply for a Lawful Development Certificate. It isn’t compulsory, but it proves the work was lawful, and a buyer’s solicitor will ask for it when you sell.

If you need planning permission, a householder application in England costs £548 from 1 April 2026, and a further national fee change takes effect on 8 December 2026. Use the Planning Portal fee calculator for the current figure. Councils aim to decide householder applications within eight weeks.

Questions people ask

Do I need Building Regulations approval if I don’t need planning permission?

Yes. Planning decides whether you can build; Building Regulations cover how it’s built: foundations, structure, insulation, drainage, fire safety and ventilation. Almost every extension needs Building Regulations approval.

Does a conservatory need planning permission?

A conservatory is treated like any other single-storey extension for planning, so the same size limits apply. It can be exempt from Building Regulations if it is under 30 square metres, separated from the house by external-quality doors and has its own heating controls.

Can my neighbour stop a permitted development extension?

Not for a standard permitted development extension. For the larger rear extension scheme, neighbours are consulted and the council considers their objections on light and privacy. Party wall rules apply separately.

Not sure which route your extension needs? We’ll check it at the survey visit. Book a survey visit or call 07802 758763.

Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy