Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Blog

Water neutrality has been lifted: what it means for building in Horsham and Crawley

A house and extension with a water butt, a water drop and flowing water lines

Short answer: Natural England withdrew its water neutrality position statement on 31 October 2025. Horsham District Council says the requirement no longer applies to individual planning applications from 1 November 2025. You don’t need a water neutrality statement or an offsetting payment. New homes still have to meet a tighter water-use standard.

What water neutrality was

From September 2021, Natural England’s position was that new development in Southern Water’s Sussex North water supply zone had to show it wouldn’t increase water use. The concern was water taken from the ground to supply the area and its effect on protected habitats in the Arun Valley.

The zone covers most of Crawley (but not Gatwick or Maidenbower), most of Horsham District, and parts of Mid Sussex, Chichester District and the South Downs National Park. For four years, applications that created new homes needed a water neutrality statement, which held up many schemes. An ordinary extension usually wasn’t caught because it doesn’t add a household. Annexes, conversions and new houses in gardens were.

What changed in 2025

  • 31 October 2025: Natural England issued a statement withdrawing its 2021 position.
  • 1 November 2025: Southern Water’s savings of around 3.24 million litres a day were made available, so that all development could move forward as water neutral.
  • Crawley Borough Council now says there is no longer a requirement to show that development in the zone is water neutral.
  • The certification scheme that was being set up to sell water credits (SNWCS, formerly SNOWS) will not launch.

Horsham’s page notes that the change to the abstraction licence, which the withdrawal statement linked to March 2026, had not yet taken effect. Until it does, council officers keep carrying out their own habitat assessments, but applicants don’t need to do anything extra.

What it means for your project now

  • Extensions and loft conversions: no water neutrality statement is needed.
  • Annexes: Horsham’s guidance doesn’t deal with them directly. If an annexe could be lived in as a separate home, check with the case officer before you apply.
  • New homes, including a house in a large garden or a conversion into flats, must meet the Building Regulations Part G optional standard of 110 litres per person per day (Horsham Policy 37).
  • Permissions with water neutrality conditions can have them removed by applying under section 73. For a householder permission, that costs £112 from 8 December 2026 (new planning fees).
  • Applications already in the system: tell your case officer how you want to proceed.

Projects worth looking at again

If you shelved plans between 2021 and 2025, they may be easier to take forward now:

  • a garden annexe or granny flat for a relative
  • converting a large house into two homes, or a loft into a self-contained flat
  • building a new home in a large garden or on a corner plot
  • converting a barn or outbuilding into a home

Each still needs planning permission and Building Regulations approval, and the usual design, parking and neighbour issues still apply. Our extensions and renovations pages explain how we run these jobs.

Using less water anyway

The rules have relaxed, but the area still has a tight water supply. Building water efficiency into an extension costs little and cuts bills: dual-flush WCs, flow-limited taps and showers, an A-rated dishwasher and washing machine, and a water butt on the new downpipe.

Questions people ask

Do I need a water neutrality statement for an extension in Horsham?

No. Since 1 November 2025, Horsham District Council doesn’t require one for any development, and extensions were rarely affected before.

Does water neutrality still apply in Crawley?

No. Crawley Borough Council says there’s no longer a requirement to show that development in the Sussex North zone is water neutral.

Can I get a water neutrality condition removed?

Yes. Apply under section 73 to remove or vary the condition, and ask to vary any linked section 106 obligation. Your case officer can confirm what’s needed.

Thinking about an annexe, a conversion or a new home that stalled? We can look at it with you. Book a survey visit or call 07802 758763.

Sources

Last checked: 27 November 2026. Rules, grants and fees change; check the linked sources before you rely on them.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy