Builders and property maintenance across Reigate, Redhill and the RH area

Monday to Friday, 8am to 5pm

Phone: 07802 758763

Blog

Extending a home in the Surrey Hills or High Weald National Landscape

A house among rolling hills, with a side extension crossed out and a single-storey rear extension

Short answer: in a National Landscape you can still build some extensions without planning permission, but not to the side, not more than one storey at the back, and without cladding. Roof extensions such as dormers and the larger rear extension scheme aren’t available. The proposed 129 km² extension to the Surrey Hills has no effect unless the Secretary of State confirms it.

Where they are

  • Surrey Hills National Landscape: the North Downs and Greensand hills around Dorking, Box Hill, Leith Hill and Reigate Hill.
  • High Weald National Landscape: the wooded ridges around East Grinstead, Forest Row, Ardingly, Balcombe, Turners Hill and parts of Horsham district east of the town.
  • South Downs National Park, along the southern edge of Horsham and Mid Sussex districts, has its own planning authority.

National Landscape is the new name for an Area of Outstanding Natural Beauty (AONB). The legal designation and the planning rules are the same.

What changes for permitted development

National Landscapes, National Parks and conservation areas count as “Article 2(3) land”, where householder permitted development rights are narrower:

ProjectElsewhereIn a National Landscape
Single-storey rear extensionPermitted, within size limitsPermitted: 3 m deep on a semi or terrace, 4 m on a detached house
Larger rear extension (up to 6 m or 8 m) with prior approvalAvailableNot available
Side extensionSingle storey permitted, within limitsNeeds planning permission
Rear extension of more than one storeyPermitted, within limitsNeeds planning permission
Cladding in stone, render, timber, plastic or tilesPermittedNeeds planning permission
Loft dormer or other roof extensionPermitted, within limitsNeeds planning permission
Garden building more than 20 m from the housePermitted, within limitsLimited to 10 m²

Permitted development can also be removed by an Article 4 direction or a planning condition, so check those too (how to check).

The proposed Surrey Hills extension

On 7 September 2026, Natural England sent the Secretary of State an order to extend the Surrey Hills National Landscape by about 129 km², making it around 30% bigger. The proposed areas are across Surrey, Hampshire and Greater London, including land in Mole Valley and around Reigate. Much of it is already treated as an Area of Great Landscape Value in local plans.

There’s no set timescale for a decision, and the proposed areas have no new status unless the order is confirmed. If you’re planning work near the edge of the current boundary, check the published maps and expect the council to give weight to landscape character either way.

Designing for a protected landscape

  • Use local materials: clay tiles, tile-hanging, local brick, timber and, on the Greensand, stone.
  • Keep extensions subordinate to the house, with roof pitches that match.
  • Think about light spill from big glazing and rooflights in dark, rural settings.
  • The High Weald has its own housing design guide, and both National Landscapes publish management plans that councils use when deciding applications.

Check your address

Defra’s MAGIC map shows National Landscape boundaries, and your council’s planning map shows conservation areas and Article 4 directions. If you’re not sure, a lawful development certificate (£287.50 for a house extension from 8 December 2026) gives you certainty before you build.

Questions people ask

Is an AONB the same as a National Landscape?

Yes. AONBs were renamed National Landscapes in 2023. The legal designation and the planning rules haven’t changed.

Can I build a rear extension without planning permission in the Surrey Hills?

A single-storey rear extension can be permitted development: up to 3 metres deep on a semi or terrace, or 4 metres on a detached house, within the height limits. Anything bigger needs planning permission.

Will my house end up in the extended Surrey Hills?

Check the proposal maps on GOV.UK. Nothing changes unless the Secretary of State confirms the order.

We can help with drawings and planning for extensions and loft conversions in protected landscapes. Book a survey visit or call 07802 758763.

Sources

Last checked: 27 November 2026. Rules, grants and fees change; check the linked sources before you rely on them.

Book a survey visit

Tell us about your project

Choose a day that suits you for a survey visit and send a few photos if you have them. We’ll confirm a time and talk the job through.

Phone: 07802 758763

Email: hello@bloom-building.co.uk

Monday to Friday, 8am to 5pm

We use these details only to reply to your enquiry. Privacy policy