Short answer: national cost guides put a standard single-storey extension at about £1,800 to £3,000 per square metre for the build, and homes in Surrey and the South East usually sit towards the top of that range. VAT, design fees, approvals, the kitchen and finishes come on top. A written, itemised quote after a survey is the only figure to plan with.
Published build rates
| Type of extension | What the guides say | Why |
|---|---|---|
| Single-storey rear | £1,800 to £3,000 per m² nationally; higher in the South East | Foundations and roof for one floor of space |
| Side return | Often more per m² than a rear extension | Tight access, steelwork and party walls |
| Two-storey | Less per m², more in total | Foundations and roof shared by two floors |
| Loft conversion | Depends on type: rooflight, dormer or hip-to-gable | Structure, stairs and fire safety |
Sources: Checkatrade cost guide (June 2026) and HomeOwners Alliance. These are averages for comparison, not quotes.
What a build rate usually leaves out
- VAT at 20% on labour and most materials
- Design drawings and a structural engineer’s calculations
- Planning fee (£548 for a householder application from April 2026) or a Lawful Development Certificate
- Building control fees, which vary by council or approved inspector
- Party wall surveyors, if your neighbour doesn’t consent
- Kitchen, flooring, decoration and furniture
- Moving drains, upgrading the electrics or boiler, and anything hidden until the work starts
A worked example
Take a 20m² single-storey rear kitchen extension with bifold doors and a roof lantern. At £2,400 to £3,000 per m², the build alone comes to £48,000 to £60,000 before VAT. Add design, structural calculations, building control and a 10% contingency, then the kitchen itself. Treat this as an illustration of how the sums work, not a price for your house.
How to keep the cost under control
- Settle the design before you ask for prices, so every quote prices the same job.
- Ask for an itemised quote that lists what’s excluded and the provisional sums.
- Keep a contingency of 10 to 15% for what can’t be seen until the ground is open.
- Agree changes in writing, with the price, before the work is done.
- Order long-lead items early: steel, glazing, roof lanterns and kitchens.
Questions people ask
Is a two-storey extension better value?
Per square metre, usually yes, because the foundations and roof are shared between two floors. The total cost is still higher, and it needs planning permission more often.
Can I claim back the VAT on an extension?
Not usually for an extension to an existing home. Some work is reduced or zero-rated, such as certain energy-saving materials and some conversions; check with HMRC or your accountant.
How accurate is a price per square metre?
It’s a starting point for a budget. Ground conditions, steelwork, drainage, glazing and the finish make a big difference, which is why we price from a survey.
Want a written, itemised price for your extension? Book a survey visit or call 07802 758763.
Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.
