Short answer: budget around £1,800 to £3,000 per square metre for the build of a single-storey extension, before the kitchen itself, fees and VAT. The South East runs above the national average. A 20 m² extension at that rate is £36,000 to £60,000 for the build alone.
What people are doing in 2026
The 2026 Houzz & Home study found that kitchens, bathrooms and bedrooms were the most common rooms to renovate, each tackled by 27% of renovating homeowners, and that more people are improving homes they plan to stay in for good. MyBuilder’s 2026 report also found strong growth in kitchen and bathroom projects. With moving costs high, extending the kitchen remains the favourite way to get more space.
Layouts that suit local houses
- Victorian and Edwardian terraces, as in parts of Horsham, Redhill, Reigate and Dorking: a side-return infill, often combined with a short rear extension in an L-shape. Tight access and building next to the boundary make these cost more per square metre, and you’ll usually need party wall notices (our party wall guide).
- 1930s semis: a full-width single-storey rear extension with a steel beam where the back wall was, opening the kitchen, dining and family space into one room.
- 1950s to 1970s homes, common in Crawley, Burgess Hill and Haywards Heath: knock the kitchen and dining room together, then extend to the rear with a roof lantern to light the middle of the plan.
- Detached houses: a wrap-around extension along the side and rear gives room for a kitchen, a utility room and a boot room.
Where the money goes
| Part of the job | What to plan for |
|---|---|
| Foundations, walls and roof | The biggest single cost. On clay near trees, foundations can go deeper (why). |
| Steel beams and opening up | An engineer’s calculations and Building Control sign-off. |
| Glazing | Sliding or folding doors, rooflights or a lantern. Big glass is a big line on the quote. |
| Heating and electrics | Underfloor heating suits a future heat pump. Plan sockets, lighting circuits and extraction early. |
| Kitchen and appliances | Priced separately by most builders. Ranges widely with the units and worktops you choose. |
| Fees | Drawings, engineer, Building Control, and a £575 planning fee if permission is needed. |
| VAT | Most building work is charged at 20%. Get quotes that show it clearly. |
Our extension cost guide covers how prices are worked out in more detail.
Planning permission
Many single-storey rear kitchen extensions are permitted development: up to 3 metres deep on a terraced or semi-detached house and 4 metres on a detached house. Up to 6 or 8 metres is possible with prior approval (£310 from 8 December 2026). Side returns, conservation areas, National Landscapes and some newer estates have tighter rules. Start with our planning permission guide, then conservation areas, National Landscapes or newer estates if they apply to you.
Design tips that make a difference
- Put rooflights where they light the darkest part of the room, usually the old back wall, rather than above the new glazing.
- Leave at least a metre around an island so doors and drawers can open while people walk past.
- Plan extraction for the hob from the start, especially under a sloping roof.
- Check for drains. Building within 3 metres of a public sewer needs a build-over agreement with Southern Water or Thames Water, depending on where you live.
- A separate utility room keeps the washing machine noise and laundry out of an open-plan kitchen.
Questions people ask
How much does a 4 m by 5 m kitchen extension cost?
That’s 20 m². At £1,800 to £3,000 per square metre, the build is £36,000 to £60,000 before the kitchen, fees and VAT. Higher specifications, difficult access or deep foundations push it up.
How long does a kitchen extension take?
Most single-storey extensions take around 10 to 18 weeks on site, after drawings and approvals. Our timeline guide breaks this down.
Can we live at home during the work?
Usually, yes. Most people set up a temporary kitchen in another room, and the opening into the house is kept sealed until the extension is weathertight.
We build kitchen extensions and fit kitchens across the RH area (see kitchens and bathrooms and extensions). Book a survey visit or call 07802 758763.
Sources
- Checkatrade: House extension cost guide (June 2026)
- less.co.uk: House extension cost per m² in 2026
- Homebuilding & Renovating: Tips for costing your extension
- KBBFocus: 2026 UK Houzz & Home Renovation Trends Report
- Installer: MyBuilder Renovation Nation Report 2026
- MyJobQuote: House extension cost and timescales
Last checked: 27 November 2026. Rules, grants and fees change; check the linked sources before you rely on them.
