  • How much does an extension cost in Surrey in 2026?

    How much does an extension cost in Surrey in 2026?

    Short answer: national cost guides put a standard single-storey extension at about £1,800 to £3,000 per square metre for the build, and homes in Surrey and the South East usually sit towards the top of that range. VAT, design fees, approvals, the kitchen and finishes come on top. A written, itemised quote after a survey is the only figure to plan with.

    Published build rates

    Type of extensionWhat the guides sayWhy
    Single-storey rear£1,800 to £3,000 per m² nationally; higher in the South EastFoundations and roof for one floor of space
    Side returnOften more per m² than a rear extensionTight access, steelwork and party walls
    Two-storeyLess per m², more in totalFoundations and roof shared by two floors
    Loft conversionDepends on type: rooflight, dormer or hip-to-gableStructure, stairs and fire safety

    Sources: Checkatrade cost guide (June 2026) and HomeOwners Alliance. These are averages for comparison, not quotes.

    What a build rate usually leaves out

    • VAT at 20% on labour and most materials
    • Design drawings and a structural engineer’s calculations
    • Planning fee (£548 for a householder application from April 2026) or a Lawful Development Certificate
    • Building control fees, which vary by council or approved inspector
    • Party wall surveyors, if your neighbour doesn’t consent
    • Kitchen, flooring, decoration and furniture
    • Moving drains, upgrading the electrics or boiler, and anything hidden until the work starts

    A worked example

    Take a 20m² single-storey rear kitchen extension with bifold doors and a roof lantern. At £2,400 to £3,000 per m², the build alone comes to £48,000 to £60,000 before VAT. Add design, structural calculations, building control and a 10% contingency, then the kitchen itself. Treat this as an illustration of how the sums work, not a price for your house.

    How to keep the cost under control

    • Settle the design before you ask for prices, so every quote prices the same job.
    • Ask for an itemised quote that lists what’s excluded and the provisional sums.
    • Keep a contingency of 10 to 15% for what can’t be seen until the ground is open.
    • Agree changes in writing, with the price, before the work is done.
    • Order long-lead items early: steel, glazing, roof lanterns and kitchens.

    Questions people ask

    Is a two-storey extension better value?

    Per square metre, usually yes, because the foundations and roof are shared between two floors. The total cost is still higher, and it needs planning permission more often.

    Can I claim back the VAT on an extension?

    Not usually for an extension to an existing home. Some work is reduced or zero-rated, such as certain energy-saving materials and some conversions; check with HMRC or your accountant.

    How accurate is a price per square metre?

    It’s a starting point for a budget. Ground conditions, steelwork, drainage, glazing and the finish make a big difference, which is why we price from a survey.

    Want a written, itemised price for your extension? Book a survey visit or call 07802 758763.

    Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.

  • Extensions and the 2026 energy rules: Part L, heat pump grants and 0% VAT

    Extensions and the 2026 energy rules: Part L, heat pump grants and 0% VAT

    Short answer: new Building Regulations for energy were laid in March 2026 and mainly raise the bar for new homes. An extension still has to meet Part L standards for insulation and glazing. If you’re building anyway, it’s a good moment to add insulation, solar panels or a heat pump; a heat pump can get a £7,500 Boiler Upgrade Scheme grant.

    What changed in 2026

    On 24 March 2026 the government laid The Building Regulations etc. (Amendment) (England) Regulations 2026 and published new Approved Documents L and F, often called the Future Homes and Buildings Standards. They are aimed mostly at new homes: low-carbon heating and on-site renewable electricity. Industry guidance expects them to take effect in March 2027, with transitional arrangements. See the government’s Building Circular 01/2026.

    What it means for an extension

    • New walls, floors, roofs, windows and doors must meet the Part L limits for heat loss (U-values).
    • Large areas of glazing can need extra calculations, or better insulation elsewhere to compensate.
    • Extensions must be properly ventilated, and an extractor fan in a new kitchen or bathroom is normal.
    • Your building control body tells you which version of the rules your project is checked against. It depends on when the work is notified and started.

    Grants and tax breaks worth knowing

    SchemeWhat you can getUntil
    Boiler Upgrade Scheme£7,500 towards an air source or ground source heat pump; £2,500 for an air-to-air heat pumpCurrently due to run to 2028
    Boiler Upgrade Scheme (off the gas grid)£9,000 for eligible homes replacing oil or LPG heating31 March 2027
    0% VAT on energy-saving materialsInstalled insulation, heat pumps and solar panels31 March 2027

    Your installer applies for the Boiler Upgrade Scheme grant. See Ofgem and the Energy Saving Trust for eligibility.

    Doing it at the same time

    • Insulate the existing walls or floor you open up while the builders are there.
    • Size the radiators or underfloor heating for a future heat pump, even if you keep the boiler for now.
    • Plan solar panels on a new flat or pitched roof before it’s finished.
    • Leave space and a power supply outside for a heat pump unit.

    Questions people ask

    Does my extension need a heat pump?

    No. The new rules focus on new homes. An extension can be heated from your existing system, as long as it meets the Part L standards.

    Does a heat pump need planning permission?

    Many air source heat pumps on houses are permitted development, within limits on size and position. Check the Planning Portal before installing.

    Is underfloor heating worth it in an extension?

    It works well with large glazed extensions and with heat pumps, because it heats at lower temperatures. It needs a good insulated floor build-up.

    Want your extension built warm from the start? Book a survey visit or call 07802 758763.

    Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.

  • How long does an extension take? From survey to sign-off

    How long does an extension take? From survey to sign-off

    Short answer: allow four to six months from the first survey to a finished single-storey extension. The build itself is often 10 to 18 weeks; design, approvals and party wall notices take the rest. Planning permission adds about eight weeks.

    A typical timeline

    StageTypical timeWhat happens
    Survey visit and quote1 to 3 weeksWe see the job, measure up and send an itemised price
    Design and structural calculations3 to 6 weeksDrawings, steel sizes and a specification
    Planning permission (if needed)About 8 weeksCouncils aim to decide householder applications within eight weeks
    Building Regulations5 weeks to 2 months for full plansPlans are checked before work starts
    Party wall notices1 to 2 months’ noticeOften served while the design is checked
    The build10 to 18 weeksGroundworks to decoration, depending on size
    Sign-off1 to 2 weeksSnagging, the completion certificate and your paperwork

    Several stages run side by side: the party wall notices and Building Regulations checks often run during the planning decision.

    Week by week on site

    • Weeks 1 to 3: set-up, demolition, digging and pouring foundations, drainage. Building control inspects the foundations.
    • Weeks 3 to 7: walls up to roof level, steels in, roof structure on.
    • Weeks 7 to 10: roof covering, windows and doors in: the extension is weathertight.
    • Weeks 10 to 14: first fix electrics and plumbing, insulation, plastering, then knocking through.
    • Weeks 14 to 18: flooring, kitchen, second fix, decoration and snagging.

    What causes delays

    • Long lead times for steel, glazing, roof lanterns and kitchens. Order early.
    • Changes to the design once the work has started.
    • Unknowns in the ground: old drains, tree roots or soft clay.
    • Wet weather during groundworks and roofing.
    • Waiting for building control inspections or a party wall award.

    Questions people ask

    Can we stay at home during the build?

    Usually, yes. The new space is built outside first, and the knock-through happens near the end. Expect a few days without a kitchen; we’ll plan a temporary one with you.

    When is the best time of year to build?

    Starting groundworks in spring or early summer avoids the wettest months, but good builders work all year. It’s more important to have approvals and materials ready.

    What paperwork should I get at the end?

    The Building Regulations completion certificate, electrical and gas safety certificates, the FENSA or CERTASS certificate for windows, and any guarantees. Keep them for when you sell.

    Planning an extension for next year? Book a survey visit or call 07802 758763.

    Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.

  • Loft conversions: rooflight, dormer or hip-to-gable?

    Loft conversions: rooflight, dormer or hip-to-gable?

    Short answer: a rooflight conversion is the simplest, a rear dormer adds the most usable floor space for the money, and a hip-to-gable suits semi-detached and detached houses with a sloping side roof. Check you have at least 2.2m of head height at the ridge before you start.

    The three main types

    TypeBest forWhat changes
    Rooflight (Velux)Lofts that already have good head heightWindows set into the existing roof slope, a new floor and stairs
    Rear dormerTerraced and semi-detached housesA box-shaped extension off the rear roof slope, giving full-height walls
    Hip-to-gableSemi-detached and detached houses with a hipped roofThe sloping side roof is built up into a vertical gable wall, often combined with a rear dormer

    Planning rules for lofts

    Many loft conversions are permitted development under Class B, within limits: up to 40 cubic metres of extra roof space for a terraced house and 50 cubic metres for a semi-detached or detached house; nothing higher than the existing ridge; no dormers on the roof slope facing the road at the front; and side windows obscure-glazed. They don’t apply on Article 2(3) land such as conservation areas and National Landscapes. The Planning Portal loft guide shows each rule.

    Building Regulations matter more

    • Structure: new floor joists and usually steel beams, designed by a structural engineer.
    • Fire safety: a protected escape route down through the house, fire doors on the stair, and mains-wired smoke alarms.
    • Stairs: a permanent staircase with enough head height; a loft ladder doesn’t count for a habitable room.
    • Insulation and ventilation: to current Part L and Part F standards.
    • Party walls: on terraced and semi-detached houses, steels in the party wall need a party structure notice.

    Questions people ask

    How much head height do I need?

    Measure from the top of the ceiling joists to the underside of the ridge. Around 2.2m or more usually works; less than that often means a dormer or raising the roof, which needs planning permission.

    Do I need to move out during a loft conversion?

    Usually not. Most of the work happens from scaffolding and through the roof, and the stairs are opened up near the end.

    Can I add an en-suite in the loft?

    Often, yes, if the soil pipe can reach it. We check the drainage route at the survey.

    Wondering what your loft could become? Book a survey visit or call 07802 758763.

    Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.

  • Party wall notices explained: what to send your neighbours, and when

    Party wall notices explained: what to send your neighbours, and when

    Short answer: if your extension or loft conversion works on a shared wall, builds on the boundary or digs foundations close to next door, you must serve notice under the Party Wall etc. Act 1996, usually one or two months before work starts. The Act applies in England and Wales whether or not you need planning permission.

    Which works need a notice

    WorkNoticeMinimum warning
    Work on a shared (party) wall: cutting in steels, raising it, removing chimney breastsParty structure noticeTwo months
    Building a new wall on or astride the boundaryLine of junction noticeOne month
    Digging foundations within 3m of a neighbour’s building and deeper than their foundations (or within 6m in some cases)Notice of adjacent excavationOne month

    Loft conversions on terraced and semi-detached houses nearly always need a party structure notice, because the new steels sit in the party wall. Rear extensions often need an excavation notice.

    What happens after you serve notice

    • Your neighbour has 14 days to reply. They can consent, or dissent and appoint a surveyor.
    • If they don’t reply within 14 days, a dispute is assumed and surveyors are appointed.
    • The surveyor, or two surveyors, prepare a party wall award setting out how the work is done, a record of the neighbour’s property before it starts, and access arrangements.
    • The person doing the work normally pays the reasonable surveyors’ fees.
    • A notice lapses if the work hasn’t started within a year.

    How to make it easy

    • Talk to your neighbours before the notice lands. A letter from a stranger reads very differently from one you have explained over the fence.
    • Share the drawings and the expected dates.
    • Take dated photos of shared walls and boundaries before work starts.
    • Agree a single surveyor if your neighbour is happy to; it costs less than two.

    The government’s Party Wall etc. Act guidance includes example notices.

    Questions people ask

    Is a party wall agreement the same as planning permission?

    No. Planning permission and Building Regulations are separate. You can have planning permission and still need to serve party wall notices.

    Can my neighbour stop the work?

    No, the Act doesn’t give a veto. It makes sure the work is done properly and that any damage is put right.

    Who serves the notice?

    The building owner, which is you. Many people ask a party wall surveyor to prepare and serve it. We tell you at the survey visit which notices your job is likely to need.

    Planning an extension or loft on a terraced or semi-detached house? Book a survey visit or call 07802 758763.

    Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.

  • Do I need planning permission for an extension? The 2026 rules in plain English

    Do I need planning permission for an extension? The 2026 rules in plain English

    Short answer: often not, for a modest single-storey extension on a house. England’s permitted development rights allow some extensions without a planning application, within set limits. Flats, maisonettes, listed buildings and houses in conservation areas or National Landscapes have fewer or no rights, and every extension still needs Building Regulations approval.

    What permitted development allows

    The rules are in Schedule 2, Part 1, Class A of the General Permitted Development Order 2015, as amended. For a house that hasn’t lost its rights, the main limits for extensions are:

    • Single-storey rear extension: up to 3m deep on an attached house, 4m on a detached house, measured from the original rear wall.
    • Larger rear extension: up to 6m (attached) or 8m (detached) through the prior approval scheme. You notify the council, it consults your neighbours, and you wait for its decision before you start.
    • Height: no more than 4m for a single-storey extension, and no more than 3m to the eaves within 2m of a boundary.
    • Side extension: single storey, no more than 4m high and no wider than half the original house.
    • Two-storey rear extension: up to 3m deep and at least 7m from the rear boundary.
    • Coverage: extensions and outbuildings together can cover no more than half the garden around the original house.
    • Materials: similar in appearance to the existing house.

    “Original house” means the house as it was first built, or as it stood on 1 July 1948. Earlier extensions count against your allowance. The Planning Portal extensions guide and the government’s technical guidance have diagrams of each rule.

    The exceptions that catch people out locally

    • National Landscapes. Parts of the RH area sit in the Surrey Hills and High Weald National Landscapes (formerly AONBs). On this “Article 2(3) land”, side extensions and two-storey rear extensions always need planning permission.
    • Conservation areas and Article 4 directions. Reigate, Dorking and many village centres have conservation areas, and some streets have Article 4 directions that remove specific rights.
    • Flats and maisonettes have no householder permitted development rights.
    • Planning conditions. Many newer estates had permitted development rights removed when they were built. Check the original planning permission.
    • Green Belt doesn’t remove permitted development rights, but if you do need a planning application, councils judge whether the extension is “proportionate” to the original house.

    Get it in writing

    If your extension fits permitted development, apply for a Lawful Development Certificate. It isn’t compulsory, but it proves the work was lawful, and a buyer’s solicitor will ask for it when you sell.

    If you need planning permission, a householder application in England costs £548 from 1 April 2026, and a further national fee change takes effect on 8 December 2026. Use the Planning Portal fee calculator for the current figure. Councils aim to decide householder applications within eight weeks.

    Questions people ask

    Do I need Building Regulations approval if I don’t need planning permission?

    Yes. Planning decides whether you can build; Building Regulations cover how it’s built: foundations, structure, insulation, drainage, fire safety and ventilation. Almost every extension needs Building Regulations approval.

    Does a conservatory need planning permission?

    A conservatory is treated like any other single-storey extension for planning, so the same size limits apply. It can be exempt from Building Regulations if it is under 30 square metres, separated from the house by external-quality doors and has its own heating controls.

    Can my neighbour stop a permitted development extension?

    Not for a standard permitted development extension. For the larger rear extension scheme, neighbours are consulted and the council considers their objections on light and privacy. Party wall rules apply separately.

    Not sure which route your extension needs? We’ll check it at the survey visit. Book a survey visit or call 07802 758763.

    Last checked: 27 November 2026. Rules and figures change; check the linked sources before you rely on them.