Short answer: from 8 December 2026, a householder application to extend or alter one house costs £575 (it was £548 from April 2026). Asking for prior approval for a larger single-storey rear extension costs £310. All fees go up by another 3.5% on 1 April 2027.
Planning fees are set nationally, so the fee is the same whether your home is in Horsham, Crawley, Haywards Heath, Reigate or Dorking. You pay it when you submit, and it isn’t refunded if the application is refused.
The new fees for homeowners
| Application | Fee from 8 December 2026 |
|---|---|
| Extension or alteration to one house | £575 |
| Extension or alteration to two or more houses | £1,130 |
| Outbuildings, gates, fences and walls in the garden | £285 |
| Prior approval for a larger rear extension or an upward extension | £310 |
| Lawful development certificate for proposed work | Half the full fee, so £287.50 for a house extension |
| Removing or changing a condition (householder) | £112 |
| Discharging conditions (householder) | £125 |
| Non-material change to a permission (householder) | £53 |
If you’re ready to submit a householder application now, sending it before 8 December saves £27.
Which council deals with your home?
The RH postcode area crosses several council boundaries, so the postcode alone doesn’t always tell you. As a rough guide:
| Towns and villages | Council |
|---|---|
| Horsham, Southwater, Billingshurst, Henfield, Storrington | Horsham District Council |
| Crawley | Crawley Borough Council |
| Haywards Heath, Burgess Hill, Cuckfield, Hassocks, East Grinstead, Copthorne | Mid Sussex District Council |
| Redhill, Reigate, Horley, Banstead | Reigate and Banstead Borough Council |
| Dorking, Capel, Charlwood, Leatherhead | Mole Valley District Council |
| Lingfield, Godstone, Oxted, Smallfield | Tandridge District Council |
| Forest Row | Wealden District Council |
If your home is inside the South Downs National Park, the National Park Authority is the planning authority. To be certain, enter your postcode on GOV.UK’s find your local council page.
How long it takes
- Householder applications: the council should decide within 8 weeks of the application being made valid. Allow a week or two for validation first, plus a 21-day consultation with neighbours.
- Larger rear extensions (prior approval): the council has 42 days. If it hasn’t decided by then, you can go ahead.
- Lawful development certificates: these confirm that work is permitted development. There’s no fixed deadline, so apply early if a sale or a loan depends on one.
Budget for more than the fee
The application fee is usually the smallest part of getting to a decision. Allow for:
- measured survey and drawings
- a structural engineer’s calculations for beams and foundations
- Building Regulations charges. Councils can recover the costs of more building control work from 6 November 2026, so check their current charges
- a party wall surveyor if you’re building on or near a shared wall (see party wall notices explained)
- reports where they’re needed, such as a tree survey near trees, a flood risk assessment or a heritage statement in a conservation area
Three ways to avoid a wasted fee
- Check whether you need permission at all. Many single-storey rear extensions and loft dormers are permitted development (our planning permission guide explains the limits).
- Check that your permitted development rights haven’t been removed, which is common on newer estates (how to check) and in conservation areas (conservation areas guide).
- Talk to your neighbours before you submit. An objection you could have designed out costs time.
Questions people ask
Do I get the fee back if the application is refused?
No. You may be able to submit a revised application for the same site once without a fee within 12 months; check with your council before you rely on it.
Is there a fee for a prior approval for a larger rear extension?
Yes. From 8 December 2026 it’s £310. These applications used to be cheaper, and some prior approvals that were free now have a flat £310 fee.
When do I pay?
When you submit the application, usually online through the Planning Portal or the council’s own system. The council won’t start the clock until the fee is paid and the application is valid.
We can tell you on a site visit whether your project needs planning permission, and price the drawings and the build together. Book a survey visit or call 07802 758763.
Sources
- GOV.UK: Planning fees from 8 December 2026
- Planning Portal: How much does a planning application cost?
- Planning Portal news, 22 October 2026: building control charges
Last checked: 27 November 2026. Rules, grants and fees change; check the linked sources before you rely on them.